E-Truck Charging Network

Charging Infrastructure

4 Chargers × 8 Guns
180–200 kW per gun (DC Fast Charge). Modular dual-nozzle design compatible with CCS2 & future MCS standards. Scalable from 3 to 6 simultaneous charging bays.

Energy Storage (BESS)

WELTRUS ESS Cabinets
105kW/261kWh modular units. Peak shaving, grid import limitation (<1MW), and off-grid backup capability. Configurable 2–3 unit arrays per site.

Solar Generation

WELTRUS Solar PV Arrays
Commercial-grade panels integrated with BESS for self-charging mobile modules and hub site offset. Adjustable capacity for regional demand scaling.

Energy Management

AMANI POWER EMS
AI-embedded edge control with 100+ successful deployments globally. Real-time load balancing, dispatch optimization, billing integration, and cloud monitoring.

OEM Charging Systems

Open OEM Partnership Model
Evaluating leading DC fast-charger manufacturers for optimal cost, reliability, and MCS compliance. ARCH manages integration, civil works, and commissioning.

Deployment Flexibility

Plug & Play / Fixed Hub
Portable modules deploy in <1 day for remote sites. Grid-connected hubs feature reinforced concrete foundations, 45° angled bays for double-trailer trucks, and full civil/electrical infrastructure.

Back to Home